The best time to install solar
mounts is during re-roofing
Integrated mounting eliminates
any possibility of future roof leaks
Roofer will fully warranty roof exposure with solar panels
Solar panels can also be properly
secured to existing roofs
with watertight and structural attachment
|
|
Solid aluminum Fast-Jack mounts
are bolted into rafters
The easiest time to find rafters
for proper structural attachment
is before the roof is applied
|
|
Metal rails are bolted onto
mounts after the new roof is on
This provides a strong foundation
for the solar panels
Air flow beneath solar panels allows for cooler and more efficient
operation
|
|
|
Solar panels are bolted onto
metal rails
EMT conduit and exterior rated
connection boxes keep wiring safe and dry
Redwood blocks are placed beneath conduit for proper roof drainage
|
|
|
A couple of GC-1000 inverters
Metal strut is bolted into three
wall studs with stainless steel lag bolts allowing for air movement
behind inverters, providing greater cooling and stronger structural
attachment
|
|
|
All DC wiring is labeled and
loops for testing amperage provided
Each individual group of panels
is traceable for system performance evaluation as well as possible
future troubleshooting
|
|
|
Another high quality GO Solar
Company installation
Pictured below are other Inverters
installed by GO Solar Company
|
 |
|
Sunny Boy 2500 Watt Inverter |
 |
|
Three Xantrex STXR2500
Inverters